Promised vs. Produced Tracker · As of Q3 2026

We follow America's biggest factory promises until they produce.

33% of 165 are producing so far. We recount every quarter. The data is open.Open data

Our methodology
Alabama: 7 promises, 4 producingArizona: 6 promises, 2 producingColorado: no tracked promiseFlorida: no tracked promiseGeorgia: 9 promises, 4 producingIndiana: 8 promises, 1 producingKansas: 2 promises, 1 producingMaine: no tracked promiseMassachusetts: no tracked promiseMinnesota: no tracked promiseNew Jersey: no tracked promiseNorth Carolina: 13 promises, 4 producingNorth Dakota: no tracked promiseOklahoma: 2 promises, 0 producingPennsylvania: 5 promises, 0 producingSouth Dakota: 1 promise, 0 producingTexas: 27 promises, 11 producingWyoming: no tracked promiseConnecticut: no tracked promiseMissouri: no tracked promiseWest Virginia: 1 promise, 0 producingIllinois: 3 promises, 2 producingNew Mexico: 2 promises, 1 producingArkansas: 2 promises, 1 producingCalifornia: 3 promises, 1 producingDelaware: 1 promise, 0 producingDistrict of Columbia: no tracked promiseIowa: 1 promise, 0 producingKentucky: 7 promises, 1 producingMaryland: no tracked promiseMichigan: 8 promises, 5 producingMississippi: 2 promises, 1 producingMontana: 1 promise, 1 producingNew Hampshire: no tracked promiseNew York: 5 promises, 1 producingOhio: 5 promises, 3 producingOregon: 2 promises, 1 producingTennessee: 6 promises, 3 producingUtah: 1 promise, 0 producingVirginia: 7 promises, 1 producingWashington: no tracked promiseWisconsin: 2 promises, 0 producingNebraska: 1 promise, 0 producingSouth Carolina: 7 promises, 1 producingIdaho: 1 promise, 0 producingNevada: 2 promises, 1 producingVermont: no tracked promiseLouisiana: 15 promises, 3 producingRhode Island: no tracked promiseMicron Megafab Clay (White Pine Commerce Park) · $100B · Under constructionTexas Instruments Sherman Fab (SM1) · $30.0B · ProducingIntel Fab 52 & Fab 62 (Ocotillo, Chandler AZ) · $20.0B · ProducingIntel Ohio One (Silicon Heartland) New Albany · $20.0B · Under constructionSamsung Taylor Fab · $17.0B · Under constructionSpaceX Terafab Grimes County · $16.8B · AnnouncedMicron Boise Idaho Memory Fab · $15.0B · Under constructionMesabi Metallics Steel Mill (Lee County, Iowa) · $15.0B · AnnouncedTSMC Fab 21 Phoenix · $12.0B · ProducingGlobalFoundries Fab 8 Expansion Malta · $11.6B · Under constructionTexas Instruments LFAB2 Lehi · $11.0B · Under constructionFoxconn Wisconn Valley Science and Technology Park (Gen 10.5 LCD fab), Mount Pleasant · $10.0B · CancelledGulf Coast Growth Ventures (Gregory, TX) · $10.0B · ProducingFormosa Plastics Sunshine Project (FG LA LLC), St. James Parish · $9.4B · PausedGron Fuels Renewable Fuel Complex (Port of Greater Baton Rouge) · $9.2B · AnnouncedGolden Triangle Polymers Complex (CPChem/QatarEnergy), Orange TX · $8.5B · Under constructionAscension Clean Energy (ACE) · $7.5B · AnnouncedExxonMobil Baytown Low-Carbon Hydrogen Facility · $7.0B · CancelledNacero Penwell gas-to-gasoline plant · $6.5B · PausedEli Lilly Generation Park API Facility (Houston) · $6.5B · Under constructionHIF Matagorda eFuels Facility · $6.0B · AnnouncedEli Lilly API Facility Huntsville · $6.0B · AnnouncedBlueOval SK Battery Park (Glendale, Kentucky) · $5.8B · ClosedHyundai Steel Louisiana EAF Integrated Steel Mill (RiverPlex MegaPark) · $5.8B · AnnouncedFord BlueOval City · $5.6B · Under constructionHyundai Metaplant America (Ellabell, Georgia) · $5.5B · ProducingRivian East Atlanta Megasite EV Assembly Plant · $5.0B · Under constructionGlobalWafers America 300mm Silicon Wafer Fab (Sherman) · $5.0B · ProducingWolfspeed John Palmour Manufacturing Center (Siler City) · $5.0B · ProducingHyundai-SK Battery Manufacturing America (HSBMA) Bartow County · $5.0B · ProducingHanwha Philly Shipyard $5B Expansion · $5.0B · Under constructionEli Lilly Goochland County API and Drug Product Facility (West Creek) · $5.0B · AnnouncedJetZero Z4 Greensboro Assembly Campus (Piedmont Triad International Airport) · $4.7B · Under constructionSt. Charles Clean Fuels Blue Ammonia (St. Rose) · $4.6B · AnnouncedAir Products Louisiana Clean Energy Complex (LCEC) · $4.5B · CancelledHL-GA Battery Company (Hyundai-LG Energy Solution JV), Bryan County GA · $4.3B · Under constructionNovo Nordisk Clayton Second Fill/Finish Facility · $4.1B · AnnouncedGM Orion Assembly EV Pickup Conversion (Orion Township, MI) · $4.0B · Under constructionVinFast EV Assembly Plant (Triangle Innovation Point, Chatham County) · $4.0B · PausedPanasonic Energy Kansas Battery Factory (De Soto) · $4.0B · ProducingAir Products–AES Green Hydrogen Facility (Wilbarger County) · $4.0B · CancelledEmirates Global Aluminium (EGA) primary aluminium smelter, Tulsa Port of Inola · $4.0B · AnnouncedAstraZeneca Rivanna Futures API Plant (Albemarle County) · $4.0B · Under constructionSK hynix Advanced Packaging Facility West Lafayette · $3.9B · Under constructionTesla Gigafactory Nevada 4680 & Semi Expansion · $3.6B · ProducingToyota Texas San Antonio Tacoma Assembly Line Expansion · $3.6B · AnnouncedIntel Fab 9 Rio Rancho · $3.5B · ProducingL-H Battery Company Plant (Jeffersonville, Ohio) · $3.5B · ProducingRedwood Materials Carolina Campus · $3.5B · ProducingBlueOval Battery Park Michigan · $3.5B · Under constructionLake Charles Methanol II · $3.2B · AnnouncedLG Chem Clarksville Cathode Plant · $3.2B · Under constructionTexas Instruments RFAB2 Richardson · $3.1B · ProducingDG Fuels St. James Parish SAF Complex · $3.1B · AnnouncedMicron Manassas Fab Expansion · $3.0B · ProducingU.S. Steel Big River 2 (BR2) Osceola · $3.0B · ProducingGM-Samsung SDI Battery Cell Plant (SynergyCells), New Carlisle IN · $3.0B · Under constructionEli Lilly Pleasant Prairie Expansion · $3.0B · Under constructionMerck Center of Excellence for Pharmaceutical Manufacturing, Elkton · $3.0B · Under constructionSaronic Port Alpha Shipyard · $3.0B · AnnouncedNucor Sheet Mill West Virginia (Apple Grove, Mason County) · $2.7B · Under constructionUltium Cells / LG Energy Solution Lansing (Delta Township, MI) · $2.6B · ProducingProject YaREN Blue Ammonia (Ingleside) · $2.6B · AnnouncedNovelis Bay Minette Aluminum Mill · $2.5B · Under constructionStarPlus Energy Battery Plant Kokomo (Stellantis-Samsung SDI) · $2.5B · ProducingQcells Cartersville Solar Factory · $2.5B · ProducingU.S. Steel Mon Valley Works Hot Strip Mill (Edgar Thomson) · $2.5B · AnnouncedGotion Battery Component Manufacturing Facility Big Rapids · $2.4B · CancelledUltium Cells Lordstown, Ohio · $2.3B · ProducingUltium Cells Spring Hill · $2.3B · ProducingBristol Myers Squibb Generation Park Campus, Houston · $2.3B · AnnouncedFactory ZERO (GM Detroit-Hamtramck Assembly) · $2.2B · ProducingEli Lilly LEAP Lebanon manufacturing sites (API & Advanced Therapies), Boone County IN · $2.1B · Under constructionExxonMobil Baytown Chemical Expansion (Vistamaxx + Linear Alpha Olefins) · $2.0B · ProducingGM Spring Hill Assembly EV Conversion (Cadillac LYRIQ) · $2.0B · ProducingFujifilm Diosynth Biotechnologies Holly Springs · $2.0B · ProducingEnvision AESC Gigafactory Bowling Green · $2.0B · Under constructionWorld Energy SAF Hub Expansion, Paramount · $2.0B · CancelledNutrien Geismar Clean Ammonia Facility · $2.0B · CancelledBlue Point Complex (CF Industries/JERA/Mitsui low-carbon ammonia) · $2.0B · Under constructionScout Motors Blythewood Assembly Plant · $2.0B · Under constructionGotion Manteno Battery Plant · $2.0B · ProducingAmkor Peoria Advanced Packaging Facility · $2.0B · Under constructionAmplify Cell Technologies Battery Cell Factory (Marshall County, MS) · $2.0B · Under constructionJohnson & Johnson Biologics Manufacturing Campus, Wilson County NC · $2.0B · Under constructionFord Louisville Assembly Plant (Universal EV / Fathom) · $2.0B · Under constructionRegeneron Saratoga Springs Biologics Plant · $2.0B · AnnouncedUCB Biologics Manufacturing Facility (Rowen, Gwinnett County) · $2.0B · AnnouncedSteel Dynamics Sinton Flat Roll Steel Mill · $1.9B · ProducingAluminum Dynamics Columbus Aluminum Flat-Rolled Mill · $1.9B · ProducingBosch Roseville Silicon Carbide Fab · $1.9B · Under constructionSkyWater Indiana Semiconductor Fab (Purdue Discovery Park District) · $1.8B · CancelledIntegra Technologies Wichita OSAT Plant · $1.8B · AnnouncedLinde Clean Hydrogen Complex Beaumont · $1.8B · Under constructionBaystar Ethane Cracker Port Arthur · $1.7B · ProducingUSA BioEnergy Advanced Biorefinery Bon Wier · $1.7B · AnnouncedLG Energy Solution Holland Plant Expansion (Michigan) · $1.7B · ProducingFREYR Giga America (Coweta County, GA) · $1.7B · CancelledSK Battery America Commerce, Georgia · $1.7B · ProducingMazda Toyota Manufacturing Huntsville · $1.6B · ProducingDetroit Assembly Complex - Mack · $1.6B · ProducingOur Next Energy ONE Circle Gigafactory (Van Buren Township) · $1.6B · ProducingENTEK Lithium Separators Terre Haute · $1.5B · Under constructionRivian Normal Plant R2 Expansion · $1.5B · ProducingOctapharma Critical-Care Manufacturing Facility, Rock Hill · $1.5B · AnnouncedDiamond Green Diesel Port Arthur · $1.4B · ProducingLG Energy Solution Arizona Battery Complex (Queen Creek) · $1.4B · Under constructionToyota Indiana BEV SUV (Princeton) · $1.4B · Under constructionNatron Energy Sodium-Ion Battery Gigafactory (Kingsboro Megasite, Edgecombe County) · $1.4B · CancelledSouthern Energy Renewables Green Methanol and SAF Facility (St. Charles Parish) · $1.4B · AnnouncedAbbVie Durham Manufacturing Campus · $1.4B · AnnouncedNucor Steel Brandenburg · $1.4B · ProducingMicroporous Lithium-Ion Battery Separator Plant (Southern Virginia Megasite) · $1.4B · Under constructionBraidy Industries Aluminum Rolling Mill (Unity Aluminum), Greenup County KY · $1.3B · CancelledMethanex Geismar 3 (G3) · $1.3B · ProducingAlbemarle Lithium Mega-Flex Facility (Richburg, SC) · $1.3B · PausedToyota TMMK Georgetown BEV (three-row Highlander EV) · $1.3B · Under constructionCleveland-Cliffs Middletown Works green-steel DRI project · $1.3B · CancelledHanwha Pine Bluff Arsenal Energetic Materials Plant · $1.3B · AnnouncedSmithfield Foods Sioux Falls Processing Facility · $1.3B · AnnouncedToyota Battery Manufacturing, North Carolina (TBMNC) · $1.3B · ProducingL3Harris Virginia Advanced Propulsion Facilities (VAPF), Orange County · $1.3B · AnnouncedWanhua Chemical MDI Complex (Convent, St. James Parish) · $1.2B · CancelledShintech Plaquemine PVC/VCM Expansion · $1.2B · ProducingMP Materials 10X Northlake · $1.2B · AnnouncedMartinez Renewable Fuels · $1.2B · ProducingKORE Power KOREPlex Battery Cell Gigafactory (Buckeye, AZ) · $1.2B · CancelledAmerican Battery Factory Tucson Gigafactory · $1.2B · Under constructionEastman Molecular Recycling Facility Longview · $1.2B · PausedMontana Renewables MaxSAF Expansion (Great Falls) · $1.2B · ProducingStellantis Belvidere Assembly Plant · $1.2B · Under constructionArcelorMittal Calvert NOES Electrical Steel Facility · $1.2B · Under constructionChobani Rome Dairy Plant · $1.2B · AnnouncedUSA Rare Earth Blacksburg magnet and metal plant · $1.2B · Under constructionChobani Lehigh Valley Dairy Plant (Upper Macungie Township) · $1.2B · AnnouncedPirelli Tire Expansion Rome Georgia · $1.2B · AnnouncedNXTClean Fuels Renewable Fuels Facility (Port Westward, Clatskanie) · $1.1B · AnnouncedSmucker's Uncrustables Facility McCalla · $1.1B · ProducingEncina Point Township Circular Manufacturing Facility · $1.1B · CancelledFirst Solar Lawrence County (Trinity, Alabama) · $1.1B · ProducingFirst Solar Louisiana Manufacturing Facility (Iberia Parish) · $1.1B · ProducingMercedes-Benz EV Production Vance/Tuscaloosa (EQ SUV) · $1.0B · ProducingDENSO Manufacturing Tennessee (DMTN) Maryville electrification expansion · $1.0B · ProducingWolfspeed Mohawk Valley Fab (Marcy) · $1.0B · ProducingTesla Gigafactory Texas · $1.0B · ProducingMonolith Materials Olive Creek 2 (OC2), Hallam NE · $1.0B · AnnouncedEli Lilly Parenteral Products and Device Facility, Concord · $1.0B · ProducingLEGO Group US Factory, Chesterfield County · $1.0B · Under constructionAscend Elements Apex 1 Hopkinsville · $1.0B · CancelledBMW Plant Spartanburg EV Expansion · $1.0B · Under constructionGraphic Packaging International Waco CRB Mill · $1.0B · ProducingEnel 3Sun USA Solar Gigafactory (Tulsa Port of Inola) · $1.0B · PausedAnalog Devices Beaverton Wafer Fab Expansion · $1.0B · ProducingMaxeon Solar Albuquerque (Mesa del Sol) · $1.0B · CancelledWaaree Solar Americas Brookshire · $1.0B · ProducingHighland Materials Polysilicon Plant (Project Rocks), Phipps Bend TN · $1.0B · AnnouncedLyten Lithium-Sulfur Gigafactory (Reno AirLogistics Park, Stead) · $1.0B · CancelledAmgen Holly Springs Second Drug Substance Facility · $1.0B · Under constructionBoeing South Carolina 787 Final Assembly Expansion (North Charleston) · $1.0B · Under constructionAnduril Arsenal-1 (Pickaway County, Ohio) · $1.0B · ProducingMerck Biologics Center of Excellence Wilmington (CRISP) · $1.0B · Under constructionJohnson & Johnson Cell Therapy Manufacturing Facility (Lower Gwynedd, PA) · $1.0B · AnnouncedPrysmian Claremont Fiber-Optic Cable & Glass Expansion · $1.0B · Under constructionCaterpillar Cat Compact Facility Sanford · $1.0B · AnnouncedSlate Auto Warsaw EV Assembly Plant · $400M · Under construction

165 promised factories since 2017 · $669B announced 54 producing · 92 not yet producing · 19 cancelled or closed

What counts

A single U.S. factory in any sector, announced since January 2017, that promised:

$1B+in capital

or

2,000+jobs in the factory

33 states, ranked by what was promised

Bar length is announced capital. The solid part is producing; the hatched part is not yet. Open a state for its own board, or see all 165 promises on one board.

  1. 1 Texas $148B · 27 promises · 11 producing
  2. 2 New York $116B · 5 promises · 1 producing
  3. 3 Louisiana $58B · 15 promises · 3 producing
  4. 4 Arizona $38B · 6 promises · 2 producing
  5. 5 North Carolina $30B · 13 promises · 4 producing
  6. 6 Georgia $29B · 9 promises · 4 producing
  7. 7 Ohio $28B · 5 promises · 3 producing
  8. 8 Michigan $20B · 8 promises · 5 producing
  9. 9 Virginia $19B · 7 promises · 1 producing
  10. 10 Indiana $17B · 8 promises · 1 producing
  11. 11 Tennessee $15B · 6 promises · 3 producing
  12. 12 Idaho $15B · 1 promise · 0 producing
  13. 13 Iowa $15B · 1 promise · 0 producing
  14. 14 Kentucky $15B · 7 promises · 1 producing
  15. 15 Alabama $15B · 7 promises · 4 producing
  16. 16 Wisconsin $13B · 2 promises · 0 producing
  17. 17 South Carolina $12B · 7 promises · 1 producing
  18. 18 Utah $11B · 1 promise · 0 producing
  19. 19 Pennsylvania $11B · 5 promises · 0 producing
  20. 20 Kansas $6B · 2 promises · 1 producing
  21. 21 California $5B · 3 promises · 1 producing
  22. 22 Oklahoma $5B · 2 promises · 0 producing
  23. 23 Illinois $5B · 3 promises · 2 producing
  24. 24 Nevada $5B · 2 promises · 1 producing
  25. 25 New Mexico $5B · 2 promises · 1 producing
  26. 26 Arkansas $4B · 2 promises · 1 producing
  27. 27 Mississippi $4B · 2 promises · 1 producing
  28. 28 West Virginia $3B · 1 promise · 0 producing
  29. 29 Oregon $2B · 2 promises · 1 producing
  30. 30 South Dakota $1B · 1 promise · 0 producing
  31. 31 Montana $1B · 1 promise · 1 producing
  32. 32 Delaware $1B · 1 promise · 0 producing
  33. 33 Nebraska $1B · 1 promise · 0 producing
capital now producing capital not yet producing, or cancelled

15 of the lower 48 have no tracked promise since 2017. A share-producing rank appears on the 17 state pages with three or more promises. Each of those states has only a few rows, so the rank is a count, not a judgment.

Why this matters

An announcement doesn’t hire anyone.

When a promised factory is late or never produces, the company isn’t the only one that pays.

Cite the Tracker

The data is CC BY 4.0. Use it for anything, commercial work included, and name the Tracker when you do.

Short form, for slides, posts and articles

Source: IndustriousAF, Promised vs. Produced Tracker (as of Q3 2026)

Full citation

IndustriousAF. (2026). Promised vs. Produced Tracker (Version 1.8) [Data set]. https://doi.org/10.5281/zenodo.23116675

The data behind every figure here is on GitHub.

Found something wrong? Correct us on GitHub, or email us.

The next recount

Get the recount when we publish it.

We recount every promise each quarter. The next one is due at the end of Q4 2026.

How we collected this
Data: Promised vs. Produced Tracker, 165 promises at the $1B or 2,000 direct jobs floor across 33 states, verified through 2026-10-03 · A person verified every promise against its sources, and we have logged 88 corrections · 165 of 165 carry both a promise source and a status source · map: Census cartographic boundaries via us-atlas, AlbersUSA · We placed each site at its town by hand and drew the bars and marks from the Tracker, without a chart library